[BladePipe](https://www.bladepipe.com/) is a real-time data integration and CDC platform. It helps you build data pipelines in a no-code way between different databases, data warehouses and data lakes, including Apache Cloudberry.

BladePipe supports data movement from PostgreSQL/Greenplum to Apache Cloudberry, including: 

- Schema migration.
- Full data migration.
- Incremental data synchronization.
- Data verification and correction.
- DDL synchronization for common schema changes.

This document will show how to synchronize data from PostgreSQL to Apache Cloudberry.

## Prerequisites

- Make sure the PostgreSQL account has the [required permissions](https://www.bladepipe.com/docs/dataMigrationAndSync/datasource_func/PostgreSQL/privs_for_pg/).
- Apache Cloudberry is deployed and running.
- [BladePipe (v1.6.0 or higher)](https://www.bladepipe.com/docs/productOP/onPremise/installation/install_all_in_one_docker/) is installed and accessible.

## Steps

### Step 1: Add DataSources

1. Log in to BladePipe. Go to **DataSource** > **Add DataSource**.
![](../../media/bladepipe1.png)

2. Add Apache Cloudberry and PostgreSQL separately as a DataSource:
   - **Deployment**: Select **Self-managed**.
   - **Type**: Select **Cloudberry** / **PostgreSQL**.
   - **Host**: Enter the database host and port.
   - **Account & Password**: Enter the username and password of Cloudberry / PostgreSQL.
  
3. Click **Test Connection**. Then click **Add DataSource**.
![](../../media/bladepipe2.png)

### Step 2: Create a DataJob

1. Go to **DataJob** > **Create DataJob**.
![](../../media/bladepipe4.png)

2. Select PostgreSQL as the source DataSource and Cloudberry as the target DataSource.
![](../../media/bladepipe5.png)

3. Choose the DataJob type. For synchronization tasks, select **Incremental** with **Initial Load**. The initial load migrates existing data. Incremental sync keeps Cloudberry updated after the initial load finishes.
![](../../media/bladepipe6.png)

4. Select which tables to sync. You can include everything or pick specific ones.
![](../../media/bladepipe7.png)

5. Select the columns to sync. Here you can process data, like filtering and transformation.
![](../../media/bladepipe8.png)

6. Click **Create DataJob** to start the DataJob.
![](../../media/bladepipe9.png)

7. You can check the pipeline status and progress on the DataJob page.
![](../../media/bladepipe10.png)